Question:  How soon after pouring my floor can it be walked on?

Answer:  Generally the product can be walked on 2 to 3  hours after the pour.



Question: How much area can be poured in a day?

Answer: 5,000 to 7,500 Suare Feet depending on the layout of the project.



Question: How thick can these products be poured.

Answer: There are thickness applications to suit most needs.  Various specific    
                depths are often applied to match floor coverings heights.



Question: For Radiant Heat Systems how do you pour the floor to insure proper
                  placement of the tubes?

Answer: When pouring a Radiant System the floor is typically poured in two
                phases or lifts.  The first pour is to encapsulate the tubes, this ensures
                even heat distribution. The second lift covers the tubes and levels the
                floor.



Question: How messy are these products?

Answer: When pouring this product it dispenses in the consistancy of a thin
                milkshake, it is a self leveling material.  Some small low level
                splattering may occur but this is very easy to clean when dry.




Question: When do I schedule to do my pour for a radiant heating system?

Answer: The Building must be enclosed with roof and doors.  We typically
                pour before Sheetrock or after Texturing.